Tenaris Dalmine S.p.A.

WORK SAFETY - EXTERNAL PREVENTION AND PROTECTION SERVICE
External Safety Officer
Steelworks
2018 - 2019
External Safety Officer
FAS (Large-sized tubes factory)
2017 - 2020
TEMPORARY AND MOBILE CONSTRUCTION SITES
Works Manager - Safety Coordinator during project and execution phases
Cooling towers replacement - Steelworks
Dalmine S.p.A.
2020
Works Manager - Safety Coordinator during project and execution phases
Asbestos removal from roof - Building MAT C
Dalmine S.p.A.
2020
Works Manager - Safety Coordinator during project and execution phases
Ferrè furnace revamping - FTM
Dalmine S.p.A.
2020
Works Manager - Safety Coordinator during project and execution phases
Rotary furnace revamping - FTM
Dalmine S.p.A.
2020
Works Manager - Safety Coordinator during project and execution phases
Expander smokestack revamping
Dalmine S.p.A.
2020
Works Manager - Safety Coordinator during project and execution phases
Final calibrator change
Dalmine S.p.A.
2019
Works Manager - Safety Coordinator during project and execution phases
New EMI installation and testing Phase I
Dalmine S.p.A.
2019
Works Manager - Safety Coordinator during project and execution phases
Overhead crane replacement
Dalmine S.p.A.
2018
Works Manager - Safety Coordinator during project and execution phases
Fire-fighting system realization - Director building
Dalmine S.p.A.
2018
Works Manager - Safety Coordinator during project and execution phases
Steelworks roof restructuring
Dalmine S.p.A.
2018
Works Manager - Safety Coordinator during project and execution phases
“Buca FTM” parking pipes restructuring
Dalmine S.p.A.
2018
Works Manager - Safety Coordinator during project and execution phases
Erection and commissioning of the new heat treatment plant
Dalmine S.p.A.
2018
Works Manager - Safety Coordinator during project and execution phases
Dismantlement of sandblasting line and relocation of the grinding machine line
Dalmine S.p.A.
2018
Works Manager - Safety Coordinator during project and execution phases
Assembly of the new sandblasting line
Dalmine S.p.A.
2017
Works Manager - Safety Coordinator during project and execution phases
Assembly of the new grinding machine line
Dalmine S.p.A.
2017
Works Manager - Safety Coordinator during project and execution phases
Erection of new structural steel elements to reinforce the existing building
Dalmine S.p.A.
2017
Works Manager - Safety Coordinator during project and execution phases
Dismantlement of IGF furnace
Dalmine S.p.A.
2017
MACHINES AND PLANTS CERTIFICATION
Compliance with Annex V - D.Lgs. 81/08
Size range extension of the rolling mill drilling machine
2020
Compliance with Annex V - D.Lgs. 81/08
Steel continuous casting line CCO1
2020
CE Marking
Robotic station Tenaris University
2019
Compliance with Annex V - D.Lgs. 81/08
Maintenance stations of rolling mill MPM cages, ejector, calibrator
2019
CE Marking
Non-destructive ultrasonic monitoring machine Olympus
2019
Compliance with Annex V - D.Lgs. 81/08
Metal shelving
2019
CE Marking
Crane 9 FTM
2019
CE Marking
New ladela station
2019
Compliance with Annex V - D.Lgs. 81/08
Overhead crane TRT2
2018
CE Marking
Non-destructive electromagnetic-field monitoring machine TALOS
2018
CE Marking
Non-destructive electromagnetic-field monitoring machine GYGES
2018
CE Marking
New 28'' EMI
2018
Compliance with Annex V - D.Lgs. 81/08
Flag crane LF2
2018
Compliance with Annex V - D.Lgs. 81/08
Lathe
2018
Compliance with Annex V - D.Lgs. 81/08
Equipment for maintenance of rolling mill cages
2018
Compliance with Annex V - D.Lgs. 81/08
Heating furnace EXPANDER inlet line
2018
CE Marking
Sandblasting line for internal pipes
2018
CE Marking
Sandblasting line for external pipes
2018
CE Marking
Pipe heat treatment and straightening line TRT2
2018
CE Marking
Laser measuring machine - IMS
2018
CE Marking
Pipes non-destructive ultrasonic monitoring line
2018
Compliance with Annex V - D.Lgs. 81/08
Machine tools (milling machines, stonemasons, grinders, lathes)
2017
Compliance with Annex V - D.Lgs. 81/08
Ingot moulds turning equipment
2017
Compliance with Annex V - D.Lgs. 81/08
Trolley for wooden planks
2017
Compliance with Annex V - D.Lgs. 81/08
Scrap park equipment (Buckets, baskets, magnets, platforms, octopuses)
2017
Compliance with Annex V - D.Lgs. 81/08
Steel continuous casting machine CCO1
2016
CE Marking
Boron treatment plant
2016
Compliance with Annex V - D.Lgs. 81/08
Pipe cutter Bronx
2015
OCCUPATIONAL SAFETY AND RISK ASSESMENT
Electromagnetic fields assessment
Non-destructive electromagnetic-field monitoring line EMI
2020
Manual handling risk assessment
Accessory Center OCTG
2019
Artificial optical radiation risk assessment
Nassheuer furnace and TRT2
2019
Microclimate risk assessment
FAS (Large-sized tubes factory)
2018
Microclimate risk assessment
FTM (Medium-sized tubes factory)
2018
Noise risk assessment
TRT2 (Heat treatment line)
2018
Lighting assessment
SUCH (Supply Chain)
2018
Lighting assessment
FAS - Offices - Quality - OCTG
2018
Microclimate risk assessment
Steelworks
2017
Microclimate risk assessment
FAS (Large-sized tubes factory) e FTM (Medium-sized tubes factory)
2017
Manual handling risk assessment
FTM (Medium-sized tubes factory)
2016
Manual handling risk assessment
OCTG
2016
ENGINEERING
Take-over, technical drawing and structural analysis
Dimensioning of mechanical buffer of overhead crane runway
2020
Take-over, technical drawing and structural analysis
Trailer for test weights
2019
Take-over, technical drawing and structural analysis
Trailer for bars
2019
Take-over, technical drawing and structural analysis
Shuttle
2019
Take-over, technical drawing and structural analysis
Guillotine cylinder chain
2018
Take-over, technical drawing and structural analysis
Sliding gate
2018
Take-over, technical drawing and structural analysis
Ladle manipulator
2017

Contact us

Pro Safe – Società Tra Professionisti S.p.A.
Via Guido Galimberti 6
24124 Bergamo – Italy
VAT N. 04090100167
Share Capital 50.000 € i.v.
T +39 035 2817808
info@pro-safe.it

ProSafe HSE Engineering S.r.l.
Aleea Liliacului nr. 27
Jud. Salaj, Mun. Zalău – Romania
C.I.F.: RO41378047

© ProSafe – Engineering, Safety and Certification in Bergamo